- After 1029 visits
- 02-After 1379 visits
- After 837 visits
- After 852 visits
- After 777 visits
- Engineered beam 939 visits
- Joists up 912 visits
- Framing started 929 visits
- Joists up 762 visits
- All done 760 visits
- Beam up 706 visits
- Complete 698 visits
- Upper stairs 833 visits
- Prep beam 1063 visits
- Railing done 1281 visits
- Open space under 962 visits
- No center post 703 visits
- Big beam 1003 visits
- Glulams ready to go 1034 visits
- Deck done 1061 visits
- Beefy beam 737 visits
- Clean look 1390 visits
- What a difference 1728 visits
- All done 1702 visits
- Needs posts 1002 visits
- Clean under 1369 visits
- Deck done 1032 visits
- After 1180 visits
- After 989 visits
- 2017-022-Stolting-After 1497 visits
- After 868 visits
- After 954 visits
- Strong beam 1091 visits
- Wrap beam later 1320 visits
- Lower deck hangs 1051 visits
- Strong beam 971 visits
- Wide open and ready for patio 1097 visits