Home 13920
- 07 Snow came 658 visits
- 07 Squash block 1015 visits
- 07 Stair Parts 551 visits
- 07 Stair Treads Ready 683 visits
- 07 Stair frame 819 visits
- 07 Stair framing 631 visits
- 07 Stair pad done 701 visits
- 07 Stairs 616 visits
- 07 Stairs 904 visits
- 07 Stairs Ready 668 visits
- 07 Step poured 677 visits
- 07 Stiar parts 574 visits
- 07 Stone under 1193 visits
- 07 Structure done 800 visits
- 07 Structure is up 676 visits
- 07 Sunburst 655 visits
- 07 Taking over the common g 639 visits
- 07 Temp wall 725 visits
- 07 The Door to Nowhere 684 visits
- 07 The Lumberyard 734 visits
- 07 The lumberyard 746 visits
- 07 The lumberyard 738 visits
- 07 Through the concrete 612 visits
- 07 Under construction 848 visits
- 07 Under stairs 1156 visits
- 07 Winders on bench 906 visits
- 07 Windows 607 visits
- 07 Windows 001 530 visits
- 08 Building the framing 115 visits
- 08 Floor Installation 46 visits
- 08 Lining things up 95 visits
- 08 New railings are going up 106 visits
- 08 Skylight and ceiling fan are up 150 visits
- 08-All-clean 542 visits
- All done 573 visits
- 08-All-done 742 visits
- 08-All-fits 816 visits
- 08-All-props-in 703 visits
- Almost down 462 visits
- 08-And-still-more-material 225 visits
- Angled decking 887 visits
- 08-Bay-is-gone 770 visits
- Beam hanging 674 visits
- 08-Beam-is-up 740 visits
- 08-Beams-in 184 visits
- 08-Beams-started 386 visits
- 08-Beams-up 244 visits
- Beams up 899 visits
- 08-Beams-up 755 visits
- 08-Beams-up 526 visits
- 08-Beams-up 693 visits
- 08-Beams-up 398 visits
- 08-Beams-up 224 visits
- 08-Beams 682 visits
- Before from above 991 visits
- Before 707 visits
- 08-Bench-going-in 700 visits
- 08-Big-hole 712 visits
- 08-Big-operation 707 visits
- 08-Blank-slate 825 visits
- 08-Building-beams 276 visits
- 08-Building-walls 310 visits
- 08-Cannot-see-bottom 750 visits
- 08-Clean-rail 290 visits
- 08-Clean-slate 777 visits
- 08-Clean-slate 863 visits
- Clean up 1147 visits
- 08-Cleaning 713 visits
- Complete 677 visits
- 08-Concrete-for-pad 673 visits
- 08-Concrete-frame 645 visits
- Concrete needs to go 715 visits
- 08-Conference 646 visits
- 08-Construction 285 visits
- Consultation 654 visits
- Cutting rafters 592 visits
- 08-Deck stairs 43 visits
- 08-Deck-Railing 753 visits
- 08-Deck-bits 695 visits
- 08-Deck-to-dump 611 visits
- Decking Started 652 visits
- 08-Decking-going-on 515 visits
- Decking going on 755 visits
- 08-Decking-on 709 visits
- 08-Decking-on 505 visits
- Decking on 688 visits
- 08-Decking-on 541 visits
- Decking on 658 visits
- 08-Decking-on 226 visits
- 08-Decking-on 832 visits
- 08-Decking-on 686 visits
- 08-Decking-one 656 visits
- Decking started 693 visits
- 08-Decking 339 visits
- 08-Decking 414 visits
- 08-Decking 349 visits
- 08-Decking 355 visits
- 08-Decking 741 visits
- Decks stripped 673 visits
- 08-Deep-hole 773 visits