Home 63
Creation date / 2007 / August
- 06 New gate 819 visits
- 07 Rail going up 743 visits
- 08 New gate 722 visits
- 09 New gate outside 735 visits
- 10 Seal of approval 785 visits
- 11 Sunburst 663 visits
- 12 Complete 737 visits
- 13 Complete 695 visits
- 14 Gravel under 694 visits
- 15 Nice fit 722 visits
- 02 Materials arrive 886 visits
- 01 Before 1066 visits
- 03 Materials Land 863 visits
- 04 Footers dug 855 visits
- 05 Hot tub concrete form 1440 visits
- 06 Pad for hot tub 965 visits
- 07 Floor framing 880 visits
- 08 Floor framing complete 809 visits
- 09 Screen porch decking 862 visits
- 10 Stairs 849 visits
- 11 Roof framed 790 visits
- 12 Hot tub in place 884 visits
- 13 Rail going up 765 visits
- 14 Benches going in 894 visits
- 15 Shingles on 858 visits
- 16 Bench lighting 858 visits
- 17 Bench on Grill side 847 visits
- 18 Where is that las skylight 714 visits
- 19 Wall stripped 905 visits
- 01 Before 854 visits
- 02 Tear down begins 832 visits
- 03 First of 4 787 visits
- 04 Just the tub left 761 visits
- 20 Night inside 814 visits
- 21 Look at the pretty lights 726 visits
- 22 Door on grill side 804 visits
- 23 Complete 800 visits
- 24 Nice fit to the house 878 visits
- 25 Get the steaks going 807 visits
- 26 Cypress wall 785 visits
- 28 Hot tub side 966 visits
- 29 Nicely finished 878 visits
- 30 What a view 855 visits
- 27 Vent cover 885 visits
- 31 Wall and ceiling tie together 745 visits
- 32 Tub is a perfect fit 826 visits
- 33 After 907 visits
- 03 Material 729 visits
- 01 Before 746 visits
- 02 Before 750 visits
- 01 Before 920 visits
- 02 Before 917 visits
- 03 Before 854 visits
- 03 Framing 698 visits
- 04 Rail post 761 visits
- 05 Before inside 682 visits
- 06 Starting work for window 669 visits
- 07 Door hole cut 684 visits
- 08 Door in 735 visits
- 09 Sealed tight 714 visits
- 10 Windows in 680 visits
- 11 Window outside 722 visits
- 12 Deck complete 1039 visits