Home 100
Creation date / 2014 / August
- Building stairs 841 visits
- Loading decking 711 visits
- Solid frame 685 visits
- Prefab the stairs 678 visits
- Driveway workshop 689 visits
- Finishing rail 717 visits
- Going up 720 visits
- Pattern board 755 visits
- Ready to relax 743 visits
- New and fresh 761 visits
- Good size 788 visits
- Fits right in 793 visits
- Nice finish 791 visits
- Return pile 751 visits
- New and fresh 551 visits
- WD is here 796 visits
- Tear down begins 747 visits
- More tear down 696 visits
- Remove old decking 737 visits
- Concrete needs to go 714 visits
- Old deck gone 713 visits
- Need to clear 784 visits
- Before 929 visits
- Breaking concrete 716 visits
- Move concrete 780 visits
- Walk it in 720 visits
- Lots of concrete 675 visits
- A drop in the bucket 682 visits
- Hill graded 782 visits
- Footing hole 803 visits
- I love the dirt 736 visits
- Driveway workshop 837 visits
- Lots of material 664 visits
- A big operation 1096 visits
- Joists going in 1055 visits
- Framing done 1060 visits
- The bones are in 1005 visits
- Finishing slab 779 visits
- Front slab 857 visits
- I love my job 896 visits
- More slab 789 visits
- Decking my favorite 762 visits
- Staircase prefab 1185 visits
- Good times 828 visits
- Material is here 712 visits
- To the dump 724 visits
- Tear down continues 674 visits
- Eye in the sky 926 visits
- Just upper structure 884 visits
- Ready to re-deck 875 visits
- Stairs in 746 visits
- Skirting 747 visits
- Wheelbarrow ramp 694 visits
- Nice finish 1022 visits
- Gate closed 1328 visits
- Metal pickets 832 visits
- Cedar railing 1722 visits
- Double gate 1271 visits
- Under storage 1494 visits
- Room for a ladder 768 visits
- Cleaned up 1027 visits
- Lots of space 995 visits
- Much nicer 1336 visits
- Like a glove 1274 visits
- Seal of quality 832 visits
- Our work is done 728 visits
- Like a glove 1102 visits
- Dump trailer full 675 visits
- Before 912 visits
- Cut man 694 visits
- Pouring pad 633 visits
- Re-bar is in there 606 visits
- Concrete finisher 654 visits
- Working on many levels 638 visits
- Almost read for rail 660 visits
- Good boy 683 visits
- Wrap attachment 707 visits
- Cutting posts 617 visits
- Clean up 746 visits
- Almost done 628 visits
- Privacy Wall 1603 visits
- Pattern board 703 visits
- A little privacy 1109 visits
- Nice view 659 visits
- Decking details 659 visits
- Furniture up 999 visits
- Ready to dine 746 visits
- Our work is done 650 visits
- Almost done 607 visits
- Ready to fill 770 visits
- Tear down begins 782 visits
- Lots of tear down 723 visits
- Out with the old 738 visits
- Need to cut a hole here 700 visits
- Less dust with water 667 visits
- Remove this 687 visits
- Material is here 684 visits
- Old deck in trailer 643 visits
- Before 897 visits
- Deep hole 694 visits