Home / 2012-Projects / Engstrom Deck 50
This one was a challenge, but the results were well worth the "brain-burn".
The client already had things in place that we wanted to incorporate into the
overall plan.
- An existing upper level deck with stairs.
- A tree that we would need to build around.
- Two exit doors from the house.
- An endless pool.
All of these things made it very tough to work out the design and then build the project.
Whitmer Decks rose to the challenge, and the results speak for themselves.
- 01-Start-with-a-Plan 736 visits
- 02-Before 811 visits
- 03-Before 825 visits
- 04-Before 736 visits
- 05-WD-is-here 773 visits
- 06-Tear-down 872 visits
- 07-Footings-dug 742 visits
- 08-Blank-slate 809 visits
- 09-Lumberyard 847 visits
- 10-Some-Beams 876 visits
- 11-More-Beams 847 visits
- 12-Joist-work 839 visits
- 13-Good-framing 883 visits
- 14-Leave-room-for-growth 854 visits
- 15-Lower-decking 764 visits
- 16-Upper-decking 818 visits
- 17-Working-pad 789 visits
- 18-Finishing 780 visits
- 19-Box-step-framed 791 visits
- 20-Need-a-broom 753 visits
- 21-Stairs-set 681 visits
- 22-Working-with-pool 729 visits
- 23-Decked-around-tree 849 visits
- 24-Stairs-framed 656 visits
- 25-Posts-up 701 visits
- 26-Wall-started 685 visits
- 27-Scrap-pile 695 visits
- 28-Nice-wall 762 visits
- 29-We-will-clean 685 visits
- 30-All-done 729 visits
- 31-Bit-of-a-change 1434 visits
- 32-Pump-cover 814 visits
- 33-Tie-to-old 718 visits
- 34-Nice-view 710 visits
- 35-Tree 708 visits
- 36-Tree 737 visits
- 37-Time-for-a-dip 746 visits
- 38-Wrapped-stairs 743 visits
- 39-Large-deck 705 visits
- 40-Ready-to-party 727 visits
- 41-In-the-trees 806 visits
- 42-To-the-pool 1354 visits
- 43-Framed-in 721 visits
- 44-Great-wall 774 visits
- 45-On-and-on 730 visits
- 46-Land-on-the-ground 763 visits
- 47-Proud-Carpenter 743 visits
- 48-Seal-of-quality 774 visits
- 49-Pool-covered 778 visits
- 50-Our-work-is-done 782 visits