Home / 2015-Projects / McGloin Deck 28
The size of the existing deck worked well, but the placement of the stairs needed to be moved. The deck was quite old and had several rotted joists.
We installed a new deck approximately the same size, but we moved the stairs to the side and included a cedar rail with metal balusters and low voltage post lighting.
We also included stone ground cover for under the deck to really finish off the look.
- Before 834 visits
- Before 623 visits
- WD is here 629 visits
- Trench for downspout 725 visits
- Stone is here 1091 visits
- The boardwalk 710 visits
- Beams up 626 visits
- Joist going in 654 visits
- Stairs ready 1031 visits
- Driveway workshop 636 visits
- Decking 677 visits
- Landin pad in 689 visits
- Rail post time 645 visits
- Driveway clean 666 visits
- Railing build 671 visits
- Last pieces 707 visits
- Complete 801 visits
- Nice fit 708 visits
- Belongs there 657 visits
- Ground cover 1144 visits
- Shadows 693 visits
- Cedar railing 1394 visits
- Decking with screws 659 visits
- From above 684 visits
- Straight down 706 visits
- Our work is done 887 visits
- Packed to leave 687 visits
- Seal of quality 694 visits