Home / 2015-Projects / McGloin Deck 28
The size of the existing deck worked well, but the placement of the stairs needed to be moved. The deck was quite old and had several rotted joists.
We installed a new deck approximately the same size, but we moved the stairs to the side and included a cedar rail with metal balusters and low voltage post lighting.
We also included stone ground cover for under the deck to really finish off the look.
- Before 804 visits
- Before 600 visits
- WD is here 600 visits
- Trench for downspout 699 visits
- Stone is here 1056 visits
- The boardwalk 680 visits
- Beams up 596 visits
- Joist going in 628 visits
- Stairs ready 997 visits
- Driveway workshop 609 visits
- Decking 650 visits
- Landin pad in 658 visits
- Rail post time 616 visits
- Driveway clean 636 visits
- Railing build 647 visits
- Last pieces 680 visits
- Complete 766 visits
- Nice fit 674 visits
- Belongs there 627 visits
- Ground cover 1112 visits
- Shadows 666 visits
- Cedar railing 1356 visits
- Decking with screws 637 visits
- From above 659 visits
- Straight down 681 visits
- Our work is done 865 visits
- Packed to leave 670 visits
- Seal of quality 669 visits