Home / 2018-Projects / Moriarty Deck 18
The old decks (front and rear) had done their job, but it was time to replace.
- Before Front 473 visits
- After Front 504 visits
- Before Rear 412 visits
- After Rear 483 visits
- Materia is here 477 visits
- Old deck gone 418 visits
- Driveway workshop 427 visits
- Footing hole 390 visits
- Rear is done 475 visits
- Outlet 564 visits
- Front is done 434 visits
- Rear is done 614 visits
- Clean railing 455 visits
- Front looks much better 450 visits
- Rear is done 436 visits
- Return pile 438 visits
- Seal of quality 448 visits
- Our work is done 473 visits