The owners really wanted to do something special. They were not interested in the typical square deck. After kicking around a few design options we settled on going with a single level and angling the open section and the stairs. Whitmer Decks created The owners really wanted to do something special. They were not interested in the typical square deck. After kicking around a few design options we settled on going with a single level and angling the open section and the stairs. Whitmer Decks created a full set of plans and reviewed them with the owners to insure everyone was thinking the same thing. The project was a great success.
- Deck complete close up 04 710 visits
- Materials are here 591 visits
- Screen applied under screened in section 620 visits
- Waiting on the french doors to replace the bay window 946 visits
- Deck complete inside view 01 667 visits
- Overhead view 01 576 visits
- Screen door with lower guard is installed 1189 visits
- Deck complete inside view 02 502 visits
- Overhead view 02 697 visits
- Starting to build walls for screened section 765 visits
- Deck complete inside view 03 693 visits
- Overhead view 03 696 visits
- Structure is near completion 776 visits
- Deck complete inside view 04 627 visits
- Overhead view 04 692 visits
- That concrete was thicker than expected 666 visits
- Deck complete inside view 05 595 visits
- Overhead view 05 768 visits
- The Whitmer Decks seal of approval 756 visits
- Deck complete inside view 06 606 visits
- Overhead view 06 696 visits
- The deck is complete 01 657 visits
- Do not forget the sign 592 visits
- Overhead view 07 683 visits
- The deck is complete 02 639 visits
- A small but functional deck 897 visits
- Dryer vent cover replaced 1134 visits
- Picketts are cut on site and ready to install 777 visits
- The deck is complete 03 603 visits
- All concrete has been replaced 546 visits
- Example of a electrical connection with a drip loop 863 visits
- Rafters are up 644 visits
- The deck is complete 04 699 visits
- Because gable vent was covered we added roof vents 803 visits
- Footing holes are complete 654 visits
- Railing almost complete 646 visits
- The deck is complete 05 657 visits
- Before 673 visits
- Holes through slab are complete 557 visits
- Railing is going up 609 visits
- The deck is complete 06 604 visits
- Can you see the wire 554 visits
- If we are going to do the job right we will need tools 579 visits
- Railing is nearing completion 632 visits
- The deck is complete 07 604 visits
- Deck complete close up 01 668 visits
- Inside view before railing and door 637 visits
- Ready to leave with exces material on truck 617 visits
- The small deck is gone 692 visits
- Deck complete close up 02 746 visits
- Job is complete and all cleaned 648 visits
- Remember where we had to cut through the concrete 681 visits
- These guys really love their job and is shows in the result 650 visits
- Deck complete close up 03 740 visits
- Joists are up 686 visits
- Roof is complete 720 visits
- Transformer for lighting is in place 636 visits