The owners really wanted to do something special. They were not interested in the typical square deck. After kicking around a few design options we settled on going with a single level and angling the open section and the stairs. Whitmer Decks created The owners really wanted to do something special. They were not interested in the typical square deck. After kicking around a few design options we settled on going with a single level and angling the open section and the stairs. Whitmer Decks created a full set of plans and reviewed them with the owners to insure everyone was thinking the same thing. The project was a great success.
- A small but functional deck 926 visits
- Dryer vent cover replaced 1160 visits
- Picketts are cut on site and ready to install 808 visits
- The deck is complete 03 630 visits
- All concrete has been replaced 576 visits
- Example of a electrical connection with a drip loop 895 visits
- Rafters are up 671 visits
- The deck is complete 04 723 visits
- Because gable vent was covered we added roof vents 831 visits
- Footing holes are complete 682 visits
- Railing almost complete 679 visits
- The deck is complete 05 683 visits
- Before 701 visits
- Holes through slab are complete 589 visits
- Railing is going up 641 visits
- The deck is complete 06 633 visits
- Can you see the wire 587 visits
- If we are going to do the job right we will need tools 604 visits
- Railing is nearing completion 660 visits
- The deck is complete 07 630 visits
- Deck complete close up 01 692 visits
- Inside view before railing and door 662 visits
- Ready to leave with exces material on truck 643 visits
- The small deck is gone 716 visits
- Deck complete close up 02 774 visits
- Job is complete and all cleaned 674 visits
- Remember where we had to cut through the concrete 704 visits
- These guys really love their job and is shows in the result 683 visits
- Deck complete close up 03 764 visits
- Joists are up 713 visits
- Roof is complete 752 visits
- Transformer for lighting is in place 664 visits
- Deck complete close up 04 738 visits
- Materials are here 623 visits
- Screen applied under screened in section 644 visits
- Waiting on the french doors to replace the bay window 976 visits
- Deck complete inside view 01 702 visits
- Overhead view 01 602 visits
- Screen door with lower guard is installed 1222 visits
- Deck complete inside view 02 526 visits
- Overhead view 02 725 visits
- Starting to build walls for screened section 795 visits
- Deck complete inside view 03 718 visits
- Overhead view 03 721 visits
- Structure is near completion 812 visits
- Deck complete inside view 04 655 visits
- Overhead view 04 716 visits
- That concrete was thicker than expected 702 visits
- Deck complete inside view 05 625 visits
- Overhead view 05 792 visits
- The Whitmer Decks seal of approval 794 visits
- Deck complete inside view 06 641 visits
- Overhead view 06 724 visits
- The deck is complete 01 679 visits
- Do not forget the sign 623 visits
- Overhead view 07 708 visits
- The deck is complete 02 668 visits