Home 115
Creation date / 2015 / September
- Old deck to dump 742 visits
- Stripped structure 686 visits
- Ready for new 723 visits
- Working 693 visits
- Cutting pickets 703 visits
- Landing pad 721 visits
- Ready to catch stairs 691 visits
- Cutting posts 689 visits
- Railing started 765 visits
- Stairs to patio 753 visits
- New decking 747 visits
- Needs railing 695 visits
- Railing done 766 visits
- All done 809 visits
- Looks good 762 visits
- Stairs down 720 visits
- Levels 717 visits
- Box steps 1373 visits
- Hold up green house 736 visits
- Privacy wall 1212 visits
- Large deck 1703 visits
- From above 667 visits
- The lot 640 visits
- The hood 756 visits
- WD is here 644 visits
- Trench for downspout 739 visits
- Stone is here 1112 visits
- The boardwalk 724 visits
- Beams up 640 visits
- Joist going in 666 visits
- Stairs ready 1052 visits
- Driveway workshop 649 visits
- Decking 687 visits
- Landin pad in 700 visits
- Rail post time 657 visits
- Before 735 visits
- Needs a door 699 visits
- Need a new gate 699 visits
- Big open deck 956 visits
- Before from above 730 visits
- The hood 1048 visits
- Driveway clean 677 visits
- Railing build 683 visits
- Last pieces 716 visits
- Complete 814 visits
- Nice fit 725 visits
- Belongs there 670 visits
- Ground cover 1164 visits
- Shadows 703 visits
- Cedar railing 1414 visits
- Decking with screws 668 visits
- From above 693 visits
- Straight down 718 visits
- Our work is done 895 visits
- Packed to leave 696 visits
- Seal of quality 701 visits
- Complete 871 visits
- Walls up 702 visits
- Just part of it 682 visits
- Driveway workshop 733 visits
- Siding cut out 717 visits
- J-Channel 656 visits
- Rafter up 801 visits
- Open roof 717 visits
- Roof sheeted 819 visits
- Basic structure 784 visits
- Door is in 768 visits
- Needs painter 772 visits
- Almost done 763 visits
- Clipped corner 797 visits
- Cantilever 789 visits
- Inspector is here 725 visits
- Screens in 764 visits
- Rails up 751 visits
- Upper lights mounted 727 visits
- Hide the wires 712 visits
- Cypress wall started 730 visits
- Flood light 797 visits
- Lights on 695 visits
- Nice view 771 visits
- Still a large deck 708 visits
- A good fit 809 visits
- Lights on stairs 782 visits
- Like it was meant to be 721 visits
- Screen door 1579 visits
- Upper deck 759 visits
- Improved gate 1140 visits
- Skylights 773 visits
- Clean lines 1196 visits
- Ready to enjoy 1341 visits
- Clipped corner 716 visits
- Outswing french door 745 visits
- Fine jointery 1356 visits
- More jointery 1060 visits
- Wall looks good 698 visits
- Ties to roof 704 visits
- Screen frames 719 visits
- Nice fan 693 visits
- Grafted on 1321 visits
- Fits well 746 visits