- Before 695 visits
- After 1634 visits
- Dump Trailer In 535 visits
- Ready to tear down 504 visits
- Material is here 479 visits
- Tear down begins 518 visits
- 1 of 3 loads 481 visits
- Set the beam 428 visits
- Pour footings 483 visits
- Upper framing 551 visits
- Landing framed 458 visits
- Upper framing done 452 visits
- Landing set 473 visits
- Lower framing done 459 visits
- Upper stairs in 482 visits
- Lower decking done 462 visits
- Rail posts started 495 visits
- Strong framing 440 visits
- Rail post sleeves 460 visits
- Railing going up 433 visits
- We will clean 442 visits
- Almost done 493 visits
- Cleaning 494 visits
- All done 1133 visits
- Nice dry space 736 visits
- Gutter up 774 visits
- Integrated stairs 591 visits
- Large lower deck 418 visits
- Drainage system meets house 716 visits
- Landing pad 709 visits
- Cocktail cap 702 visits
- Large upper deck 379 visits
- Decking details 462 visits
- Lower deck 420 visits
- Going down 397 visits
- What a great fit 421 visits
- Our work is done here 396 visits