- Before 696 visits
- After 1637 visits
- Dump Trailer In 536 visits
- Ready to tear down 505 visits
- Material is here 480 visits
- Tear down begins 518 visits
- 1 of 3 loads 481 visits
- Set the beam 428 visits
- Pour footings 483 visits
- Upper framing 551 visits
- Landing framed 458 visits
- Upper framing done 453 visits
- Landing set 473 visits
- Lower framing done 459 visits
- Upper stairs in 483 visits
- Lower decking done 463 visits
- Rail posts started 496 visits
- Strong framing 441 visits
- Rail post sleeves 460 visits
- Railing going up 433 visits
- We will clean 442 visits
- Almost done 493 visits
- Cleaning 494 visits
- All done 1134 visits
- Nice dry space 736 visits
- Gutter up 775 visits
- Integrated stairs 592 visits
- Large lower deck 418 visits
- Drainage system meets house 716 visits
- Landing pad 709 visits
- Cocktail cap 702 visits
- Large upper deck 380 visits
- Decking details 462 visits
- Lower deck 420 visits
- Going down 397 visits
- What a great fit 422 visits
- Our work is done here 397 visits