Home / 2015-Projects 114
Creation date / All / September
- Workshop 796 visits
- Ready for footings 741 visits
- Joists in 705 visits
- Footings in 693 visits
- WD is here 781 visits
- Lots of material 866 visits
- Framing 761 visits
- Beams going in 777 visits
- Flood light 815 visits
- Lights on 716 visits
- Nice view 789 visits
- Still a large deck 728 visits
- A good fit 826 visits
- Lights on stairs 797 visits
- Like it was meant to be 734 visits
- Screen door 1607 visits
- Upper deck 775 visits
- Improved gate 1157 visits
- Skylights 790 visits
- Clean lines 1223 visits
- Ready to enjoy 1370 visits
- Clipped corner 732 visits
- Outswing french door 759 visits
- Fine jointery 1372 visits
- More jointery 1086 visits
- Wall looks good 721 visits
- Ties to roof 723 visits
- Screen frames 736 visits
- Nice fan 708 visits
- Grafted on 1352 visits
- Fits well 767 visits
- Nice structure 701 visits
- Straight down 716 visits
- The hood 687 visits
- Return pile 706 visits
- Seal of quality 768 visits
- Our work is done 694 visits
- Rails up 772 visits
- Upper lights mounted 745 visits
- Hide the wires 731 visits
- Cypress wall started 752 visits
- Almost done 775 visits
- Clipped corner 806 visits
- Cantilever 803 visits
- Inspector is here 740 visits
- Screens in 778 visits
- Roof sheeted 837 visits
- Basic structure 798 visits
- Door is in 785 visits
- Needs painter 787 visits
- Rafter up 818 visits
- Open roof 732 visits
- Driveway workshop 755 visits
- Siding cut out 735 visits
- J-Channel 669 visits
- Walls up 722 visits
- Just part of it 697 visits
- Before 748 visits
- Needs a door 717 visits
- Need a new gate 717 visits
- Big open deck 977 visits
- Before from above 743 visits
- The hood 1069 visits
- Driveway clean 691 visits
- Railing build 702 visits
- Last pieces 733 visits
- Complete 833 visits
- Nice fit 748 visits
- Belongs there 689 visits
- Ground cover 1188 visits
- Shadows 720 visits
- Cedar railing 1438 visits
- Decking with screws 687 visits
- From above 711 visits
- Straight down 737 visits
- Our work is done 913 visits
- Packed to leave 715 visits
- Seal of quality 714 visits
- Landin pad in 720 visits
- Rail post time 675 visits
- Stairs ready 1075 visits
- Driveway workshop 665 visits
- Decking 705 visits
- Stone is here 1138 visits
- The boardwalk 744 visits
- Beams up 655 visits
- Joist going in 681 visits
- WD is here 658 visits
- Trench for downspout 760 visits
- Railing done 780 visits
- All done 828 visits
- Looks good 778 visits
- Stairs down 732 visits
- Levels 732 visits
- Box steps 1399 visits
- Hold up green house 752 visits
- Privacy wall 1238 visits
- Large deck 1733 visits
- From above 686 visits
- The lot 655 visits