Home / 2009-Projects / Dickson Lower Deck 42
We built them a 2nd story screeened porch a few years ago and now we are back to finish the lower level.It includes a lower deck with a bar surrounding the AC unit, a new fence and a concrete pad for the existing shed.What a change for the bette We built them a 2nd story screeened porch a few years ago and now we are back to finish the lower level.
It includes a lower deck with a bar surrounding the AC unit, a new fence and a concrete pad for the existing shed.
What a change for the better!
- 01 AC Before 880 visits
- 02 Old Gate 890 visits
- 03 Old patio 729 visits
- 04 That fence is done 792 visits
- 05 Material is here 826 visits
- 06 Old fence is down 826 visits
- 07 Lumberyard 797 visits
- 08 Trenching for downspouts 825 visits
- 09 Pad for shed 792 visits
- 10 That concrete was perfec 717 visits
- 10 That concrete was perfect 688 visits
- 11 What does that say 796 visits
- 12 More trenching 722 visits
- 13 Can you dig it 833 visits
- 14 Getting there 797 visits
- 15 Old fence in trailer 878 visits
- 16 New fence posts 839 visits
- 17 Deck framing done 933 visits
- 18 Decking going down 872 visits
- 19 Nice step 773 visits
- 20 Needs something 730 visits
- 21 Construction 774 visits
- 22 Around the posts 795 visits
- 23 AC surround started 748 visits
- 24 The gate posts 827 visits
- 25 Fence pickets 1098 visits
- 26 Ready for a gate 1044 visits
- 27 Return pile 782 visits
- 28 Nice new fence 767 visits
- 29 All done 1006 visits
- 30 Nice and clean 1219 visits
- 31 Bench back 786 visits
- 32 A proud fence 1084 visits
- 33 Peeking over 902 visits
- 34 Ready for the shed 735 visits
- 35 Nice bar 1254 visits
- 36 Room for drinks 1236 visits
- 37 Utilities 1196 visits
- 38 Access 1319 visits
- 39 Details 750 visits
- 40 Details 803 visits
- 41 Our work is done here 1147 visits