- Before 684 visits
- After 1597 visits
- Dump Trailer In 532 visits
- Ready to tear down 500 visits
- Material is here 474 visits
- Tear down begins 513 visits
- 1 of 3 loads 476 visits
- Set the beam 422 visits
- Pour footings 476 visits
- Upper framing 546 visits
- Landing framed 456 visits
- Upper framing done 447 visits
- Landing set 470 visits
- Lower framing done 455 visits
- Upper stairs in 478 visits
- Lower decking done 458 visits
- Rail posts started 492 visits
- Strong framing 437 visits
- Rail post sleeves 456 visits
- Railing going up 430 visits
- We will clean 439 visits
- Almost done 489 visits
- Cleaning 490 visits
- All done 1120 visits
- Nice dry space 721 visits
- Gutter up 756 visits
- Integrated stairs 588 visits
- Large lower deck 413 visits
- Drainage system meets house 709 visits
- Landing pad 699 visits
- Cocktail cap 697 visits
- Large upper deck 375 visits
- Decking details 458 visits
- Lower deck 417 visits
- Going down 394 visits
- What a great fit 415 visits
- Our work is done here 392 visits