- After 980 visits
- After 804 visits
- Complete 723 visits
- After 901 visits
- After 883 visits
- Beefy beam 774 visits
- Beam up 728 visits
- 2017-022-Stolting-After 1533 visits
- 02-After 1420 visits
- Railing done 1309 visits
- All done 788 visits
- Joists up 782 visits
- No center post 729 visits
- Upper stairs 858 visits
- After 1013 visits
- After 871 visits
- What a difference 1784 visits
- After 1209 visits
- After 1065 visits
- Open space under 990 visits
- Joists up 934 visits
- Lower deck hangs 1078 visits
- Strong beam 991 visits
- Framing started 951 visits
- Strong beam 1105 visits
- Engineered beam 958 visits
- Deck done 1060 visits
- Big beam 1043 visits
- Deck done 1094 visits
- Wide open and ready for patio 1122 visits
- Needs posts 1032 visits
- Glulams ready to go 1077 visits
- Clean look 1455 visits
- All done 1766 visits
- Clean under 1412 visits
- Wrap beam later 1359 visits
- Prep beam 1099 visits