Home 118
Creation date / 2008 / April
- 05 Lumber pile almost gone 839 visits
- 06 Need to clean up 844 visits
- 07 Getting close 758 visits
- 01 Before 778 visits
- 13 Our work is done here 825 visits
- 07 Nice Finish 857 visits
- 08 All done 800 visits
- 09 Just need landscaping 850 visits
- 09 The roses will climb here 880 visits
- 10 Nice bench 856 visits
- 11 Nice view 884 visits
- 12 To be filled with flowers 831 visits
- 02 WD has arrived 732 visits
- 03 Ready to work 753 visits
- 04 Lumberyard 794 visits
- 05 Tearing down 773 visits
- 06 Almost down 687 visits
- 07 Digging 720 visits
- 08 Old deck gone 770 visits
- 09 Old deck to dump 694 visits
- 17 Our work is done here 795 visits
- 10 Framing done 651 visits
- 11 Pieces parts 784 visits
- 12 We will clean 712 visits
- 16 Seal of quality 736 visits
- 15 Other side 793 visits
- 14 Nice view 762 visits
- 13 Complete 755 visits
- 04 Need to rebuild the rim board 825 visits
- 05 Not much was holding the deck 746 visits
- 06 Added insulation 728 visits
- 07 The lumberyard 733 visits
- 08 New rim board is in 790 visits
- 09 Sheeting over rim 786 visits
- 10 Make it dry 700 visits
- 11 Framing 774 visits
- 03 WD has arrived 764 visits
- 12 Making parts 693 visits
- 13 Decking going on 697 visits
- 14 Return pile 837 visits
- 18 Nice privacy wall 807 visits
- 15 Complete 821 visits
- 16 Complete 719 visits
- 17 Complete 785 visits
- 19 Under finished 844 visits
- 02 WD arrives 767 visits
- 03 Material 774 visits
- 04 Footings marked 758 visits
- 05 Footings dug 757 visits
- 06 Siding removed 686 visits
- 07 Framing 771 visits
- 01 Before 750 visits
- 02 Everything through gate 656 visits
- 08 Rail going up 737 visits
- 09 Pad in 739 visits
- 10 Ready for privacy wall 958 visits
- 11 Complete 871 visits
- 12 From stair side 707 visits
- 13 Nice rail 690 visits
- 14 Good landing 683 visits
- 15 Privacy wall done 1935 visits
- 16 The way out 698 visits
- 16 Decking seam 847 visits
- 17 Privacy from outside 1357 visits
- 02 WD has arrived 694 visits
- 03 Material 811 visits
- 04 More material 783 visits
- 05 We need to make the house stronger 610 visits
- 06 Blockin in and ledger up 712 visits
- 07 Additional rim and ledger installed 597 visits
- 08 Footings are dug 652 visits
- 09 Framing complete 758 visits
- 10 Happy Tenant 696 visits
- 11 Holes 724 visits
- 01 Before 862 visits
- 02 Before 793 visits
- 12 Almost done 682 visits
- 13 Looking good 608 visits
- 14 Nice finish 665 visits
- 15 Great view 675 visits
- 16 Seal of quality 569 visits
- 17 Time to move trailers 608 visits
- 18 The real inspector 634 visits
- 19 Thats a wrap 637 visits
- 03 Old deck to the dump 836 visits
- 02 Wd has arrived 810 visits
- 04 The lumberyard 814 visits
- 05 Holes dug 783 visits
- 06 Framing starts 855 visits
- 07 Decking on 865 visits
- 08 Pad poured 840 visits
- 11 Return pile 732 visits
- 09 Almost done 830 visits
- 02 Material 708 visits
- 10 Lights wired 840 visits
- 12 Nice landing 842 visits
- 13 Complete 865 visits
- 14 Complete 693 visits
- 15 Complete 766 visits
- 24 Our work is done here 808 visits