Home / 2008-Projects / Scheffs Rental Deck 21
Another "door to nowhere". Some day we will get rid of all of them! The tenant in this rental was very happy to get a deck that they could enjoy for the summer. They had waited quite some time and the timing could not have been better. The w Another door to nowhere. Some day we will get rid of all of them! The tenant in this rental was very happy to get a deck that they could enjoy for the summer. They had waited quite some time and the timing could not have been better. The warm weather has arrived and we finished on a Friday. I can hear the steaks sizzling now. Enjoy your new outdoor living space.
- 01 Before 831 visits
- 02 WD has arrived 690 visits
- 03 Material 803 visits
- 04 More material 777 visits
- 05 We need to make the hous 606 visits
- 05 We need to make the house stronger 606 visits
- 06 Blockin in and ledger up 705 visits
- 07 Additional rim and ledge 508 visits
- 07 Additional rim and ledger installed 594 visits
- 08 Footings are dug 639 visits
- 09 Framing complete 744 visits
- 10 Happy Tenant 681 visits
- 11 Holes 701 visits
- 12 Almost done 662 visits
- 13 Looking good 591 visits
- 14 Nice finish 645 visits
- 15 Great view 661 visits
- 16 Seal of quality 558 visits
- 17 Time to move trailers 601 visits
- 18 The real inspector 630 visits
- 19 Thats a wrap 627 visits