- 01 Before 854 visits
- 01 Before 851 visits
- 01 Before 828 visits
- 01 Before 936 visits
- 02 Not ready for play yet 786 visits
- 03 Vandalism hurts 788 visits
- 01 Material 830 visits
- 02 WD is here 758 visits
- 03 Steep hill 756 visits
- 04 Needs a deck 808 visits
- 05 Lumberyard 746 visits
- 06 Framing 809 visits
- 07 Stair frame 811 visits
- 08 Picket factory 721 visits
- 09 Lower stairs 757 visits
- 10 Workshop 729 visits
- 11 Decking on 717 visits
- 12 Gate posts 745 visits
- 13 Railing started 707 visits
- 14 Gate done 763 visits
- 15 Nice finish 813 visits
- 02 Before 831 visits
- 16 Fence looks good 769 visits
- 17 Stair landing 702 visits
- 18 Welcome 744 visits
- 03 Old deck on way to dump 802 visits
- 04 Lumberyard 800 visits
- 05 Old deck gone 747 visits
- 06 Footing hole 674 visits
- 07 Framing 786 visits
- 08 Decking going on 699 visits
- 09 Walls up 701 visits
- 10 Hot tub pad 1230 visits
- 11 Pad has set 1097 visits
- 12 Roof framed 760 visits
- 13 Ready for a roof 687 visits
- 14 Getting there 726 visits
- 15 Hot tub delivered 1147 visits
- 16 Nice fit on the tub 958 visits
- 01 Before 939 visits
- 17 Nice outlet 688 visits
- 18 Rails going up 890 visits
- 19 Roof is done 741 visits
- 20 Step up 756 visits
- 29 Our work is done here 735 visits
- 21 Nice finish 1578 visits
- 21 Nice finish coat removed from rail 792 visits
- 22 Doggie door 766 visits
- 23 Inside doggie door 725 visits
- 24 Cypress wall 723 visits
- 25 Good fit 702 visits
- 26 Finished rail 728 visits
- 27 Wow 1050 visits
- 02 WD Arrives 724 visits
- 03 Material 761 visits
- 04 Tear down begins 752 visits
- 05 Path to trailer 723 visits
- 06 Through the gate 751 visits
- 07 Patio in trailer 683 visits
- 08 Protect the yard 708 visits
- 09 Old deck gone 679 visits
- 10 The lumberyard 665 visits
- 11 Framing 723 visits
- 01 Before 798 visits
- 02 Front porch needs work 752 visits
- 03 Rail needs replaced 745 visits
- 12 Stairs going up 720 visits
- 13 Decking 729 visits
- 14 Decking 654 visits
- 15 We will clean 655 visits
- 15 Skylight tunnels 737 visits
- 16 Shingle delivery 710 visits
- 17 Roof framing 658 visits
- 18 Getting there 658 visits
- 19 Landing pad 661 visits
- 20 Roof is on 709 visits
- 21 Ready to grade 732 visits
- 22 Siding stripped 666 visits
- 23 Roof done 698 visits
- 24 Lumberyard from above 730 visits
- 25 Roof tie in 631 visits
- 26 Decking to porch 662 visits
- 27 Rail started 734 visits
- 28 Lower slider installed 677 visits
- 29 Upper slider installed 707 visits
- 30 Front yard 683 visits
- 31 Lumber return 687 visits
- 32 Complete 777 visits
- 33 Nice fit 680 visits
- 34 Standing proud 894 visits
- 35 Stairs work well 658 visits
- 36 Lower is done 769 visits
- 37 Burger flipping light 782 visits
- 38 Going down 686 visits
- 39 Screen door 694 visits
- 40 Nice view 682 visits
- 41 Wall is done 680 visits
- 42 Nice wall 742 visits
- 43 Seamless tie in 700 visits
- 44 Lots of light 734 visits