Home / 2005-Projects / Greene Deck 13
Because of the amount of sun this deck gets the decking and railing had served it's time. We were able to salvage the structure and replace the decking and the railing with composite material. The stairs had to be completely rebuilt. Because of the amount of sun this deck gets the decking and railing had served it's time. We were able to salvage the structure and replace the decking and the railing with composite material. The stairs had to be completely rebuilt.
- 01 Before 611 visits
- 02 Material 557 visits
- 03 Framing 625 visits
- 04 Landing 595 visits
- 05 Stair Striongers 596 visits
- 06 Stairs 557 visits
- 07 Sunburst 640 visits
- 08 Decking 623 visits
- 09 Complete 627 visits
- 10 Complete 1267 visits
- 11 Stair Bottom 539 visits
- 12 Furniture 1190 visits
- 13 Stairs Down 575 visits