Home / 2005-Projects / Greene Deck 13
Because of the amount of sun this deck gets the decking and railing had served it's time. We were able to salvage the structure and replace the decking and the railing with composite material. The stairs had to be completely rebuilt. Because of the amount of sun this deck gets the decking and railing had served it's time. We were able to salvage the structure and replace the decking and the railing with composite material. The stairs had to be completely rebuilt.
- 01 Before 597 visits
- 02 Material 540 visits
- 03 Framing 604 visits
- 04 Landing 569 visits
- 05 Stair Striongers 583 visits
- 06 Stairs 543 visits
- 07 Sunburst 628 visits
- 08 Decking 616 visits
- 09 Complete 619 visits
- 10 Complete 1236 visits
- 11 Stair Bottom 533 visits
- 12 Furniture 1160 visits
- 13 Stairs Down 563 visits