Home / 2005-Projects / Ladwig Deck 16
The old deck was a bit small and unsafe. The owner's wanted something was built strong and very low maintenance. We bumped out the size 2' to provide the extra space, gave it a more interesting shape and used Evergrain composite for the railing and the The old deck was a bit small and unsafe. The owner's wanted something was built strong and very low maintenance. We bumped out the size 2' to provide the extra space, gave it a more interesting shape and used Evergrain composite for the railing and the decking. The project turned out great and the owner's were very pleased.
- 01 Before 564 visits
- 02 WD Arrives 523 visits
- 03 Old deck down 467 visits
- 04 Deck Gone 546 visits
- 05 Material 504 visits
- 06 Siding to be Replaced 523 visits
- 07 Framing 608 visits
- 08 Framed 570 visits
- 09 Dump Load 505 visits
- 10 Railing Start 577 visits
- 11 New Siding 533 visits
- 12 Complete 475 visits
- 13 Complete 531 visits
- 14 Complete 461 visits
- 15 Complete 600 visits
- 16 Complete 588 visits