Home / 2010-Projects / Sergent Deck 16
The old deck had seen its day and the home grown under deck drainage system had too.
The challenge with this deck was that it had to be free standing and not connect to the house in any way because of the stucco. It was also tough because of the very limited working area.
The results were a very clean composite deck with metal balusters and a proper under deck drainage system.
- 01-Before 877 visits
- 02-Tear-down 793 visits
- 03-Close-Parking 717 visits
- 04-Not-much-room-to-work 731 visits
- 05-Footing-hole 691 visits
- 06-Framing-new-deck 739 visits
- 07-Under-deck-drainage 738 visits
- 08-Decking-one 648 visits
- 09-Tight-footing 657 visits
- 10-Free-standing 747 visits
- 11-Nice-view 662 visits
- 12-Welcome 623 visits
- 13-Seal-of-quality 634 visits
- 14-Patio-cleaned 615 visits
- 15-Knee-bracing 1251 visits
- 16-Our-work-is-done-here 661 visits