Home / 2009-Projects 718
Creation date
- 05 Off to new home 744 visits
- 03 Materials arrive 770 visits
- 04 We are going to separate 717 visits
- 03 All needs to go 686 visits
- 02 Before small deck 764 visits
- 01 Before with a hole 799 visits
- 01 Before 886 visits
- 51 Going down 845 visits
- 50 Wall at night 702 visits
- 49 Nice place to relax 777 visits
- 48 Night falls 905 visits
- 47 Done 717 visits
- 46 The seal of quality 800 visits
- 45 Lift off 937 visits
- 44 Lots of light 755 visits
- 43 Seamless tie in 724 visits
- 42 Nice wall 767 visits
- 41 Wall is done 702 visits
- 40 Nice view 698 visits
- 39 Screen door 720 visits
- 38 Going down 708 visits
- 37 Burger flipping light 800 visits
- 36 Lower is done 785 visits
- 35 Stairs work well 679 visits
- 34 Standing proud 916 visits
- 33 Nice fit 700 visits
- 32 Complete 797 visits
- 31 Lumber return 711 visits
- 30 Front yard 706 visits
- 29 Upper slider installed 727 visits
- 28 Lower slider installed 699 visits
- 27 Rail started 754 visits
- 26 Decking to porch 686 visits
- 25 Roof tie in 655 visits
- 24 Lumberyard from above 750 visits
- 23 Roof done 719 visits
- 22 Siding stripped 690 visits
- 21 Ready to grade 753 visits
- 20 Roof is on 734 visits
- 19 Landing pad 683 visits
- 18 Getting there 676 visits
- 17 Roof framing 676 visits
- 16 Shingle delivery 726 visits
- 15 Skylight tunnels 759 visits
- 15 We will clean 675 visits
- 14 Decking 677 visits
- 13 Decking 755 visits
- 12 Stairs going up 739 visits
- 03 Rail needs replaced 764 visits
- 02 Front porch needs work 766 visits
- 01 Before 821 visits
- 11 Framing 744 visits
- 10 The lumberyard 693 visits
- 09 Old deck gone 698 visits
- 08 Protect the yard 728 visits
- 07 Patio in trailer 709 visits
- 06 Through the gate 772 visits
- 05 Path to trailer 743 visits
- 04 Tear down begins 771 visits
- 03 Material 784 visits
- 02 WD Arrives 747 visits
- 27 Wow 1089 visits
- 26 Finished rail 752 visits
- 25 Good fit 718 visits
- 24 Cypress wall 749 visits
- 23 Inside doggie door 744 visits
- 22 Doggie door 788 visits
- 21 Nice finish 1612 visits
- 21 Nice finish coat removed from rail 808 visits
- 29 Our work is done here 763 visits
- 20 Step up 776 visits
- 19 Roof is done 759 visits
- 18 Rails going up 910 visits
- 17 Nice outlet 707 visits
- 01 Before 972 visits
- 16 Nice fit on the tub 1005 visits
- 15 Hot tub delivered 1183 visits
- 14 Getting there 751 visits
- 13 Ready for a roof 712 visits
- 12 Roof framed 782 visits
- 11 Pad has set 1133 visits
- 10 Hot tub pad 1267 visits
- 09 Walls up 727 visits
- 08 Decking going on 725 visits
- 07 Framing 807 visits
- 06 Footing hole 699 visits
- 05 Old deck gone 765 visits
- 04 Lumberyard 821 visits
- 03 Old deck on way to dump 825 visits
- 18 Welcome 769 visits
- 17 Stair landing 724 visits
- 16 Fence looks good 789 visits
- 02 Before 854 visits
- 15 Nice finish 834 visits
- 14 Gate done 785 visits
- 13 Railing started 725 visits
- 12 Gate posts 769 visits
- 11 Decking on 739 visits
- 10 Workshop 745 visits
- 09 Lower stairs 780 visits