Home / 2015-Projects 102
Creation date / All / April
- Dryed in 792 visits
- Installing wrap 810 visits
- In place 702 visits
- Shingle day 721 visits
- Half sheeted 715 visits
- Roof framed 781 visits
- Needs roof sheeting 1107 visits
- Rafters going in 723 visits
- Roof is going 735 visits
- Main rafters up 730 visits
- Lower stairs 785 visits
- Skylight tunnels 769 visits
- Decking almost done 757 visits
- Support posts in 731 visits
- Driveway workshop 816 visits
- Preparing posts 776 visits
- Concrete ready 774 visits
- Framing done 731 visits
- Needs posts 1065 visits
- Steep slope 838 visits
- Material delivery 755 visits
- Lots of material 707 visits
- Slippery slope 801 visits
- Framing started 761 visits
- Glulams ready to go 1124 visits
- Secure trailer 879 visits
- See you soon 771 visits
- Flanking driveway 804 visits
- Needs a screened porch 823 visits
- Clear from above 1090 visits
- Property before 995 visits
- Hood before 1016 visits
- Drone selfie 1145 visits
- Getting close 837 visits
- Rail cap 813 visits
- Clean look 1520 visits
- Finish railing 809 visits
- All done 1854 visits
- Clean under 1459 visits
- Cool railing 1122 visits
- Gutter 813 visits
- Wrap beam later 1415 visits
- Bow of the ship 1451 visits
- Ride the rail 1044 visits
- Cap joint 967 visits
- Railing joints 1172 visits
- Cedar and Trex 807 visits
- Up high 945 visits
- Straight down 999 visits
- A little higher 971 visits
- Neighbors 980 visits
- Street 953 visits
- Neighborhood 987 visits
- Nice fit 1028 visits
- Seal of quality 855 visits
- Construction 704 visits
- Staining 741 visits
- Drainage going up 759 visits
- Vent hole 779 visits
- Before 906 visits
- Decking 1155 visits
- Framing up 791 visits
- Rail parts 1074 visits
- Stain used 1121 visits
- Beam up 803 visits
- Deep hole 808 visits
- Material 753 visits
- Tear down 799 visits
- Footer 712 visits
- Gate opens out 723 visits
- Need to finish rail cap 694 visits
- Gate fixed 678 visits
- Return pile 738 visits
- Wait for it 701 visits
- Wow 838 visits
- Nice jointery 764 visits
- Ready to grill 699 visits
- Going up 778 visits
- No center post 816 visits
- From above 789 visits
- Way up 806 visits
- Ready to enjoy 782 visits
- Seal of quality 862 visits
- New header 1468 visits
- Sill flashing 1474 visits
- Door is in 1490 visits
- Trimming outside 750 visits
- Railing going up 800 visits
- Pouring pad 808 visits
- Before 903 visits
- Before 743 visits
- Before 700 visits
- Framing 848 visits
- Door will go here 752 visits
- Decking started 684 visits
- Landing ready 739 visits
- Start window demo 1518 visits
- Material is here 773 visits
- Prep for ledger 752 visits
- Digging footings 814 visits
- Footing hole 825 visits
- Prep beam 1143 visits