Home / 2015-Projects 985
Creation date
- We will clean 853 visits
- Gutter install 826 visits
- Making grooves 784 visits
- Landing pad 831 visits
- Nice wrap 843 visits
- Screens 912 visits
- Cedar spokes 1234 visits
- New door in 753 visits
- Shingles are here 850 visits
- Rafters up 808 visits
- Ready for roof 832 visits
- Building stairs 825 visits
- Prepping house 864 visits
- Workshop 790 visits
- Ready for footings 741 visits
- Joists in 704 visits
- Footings in 692 visits
- WD is here 780 visits
- Lots of material 863 visits
- Framing 760 visits
- Beams going in 770 visits
- Flood light 810 visits
- Lights on 712 visits
- Nice view 786 visits
- Still a large deck 718 visits
- A good fit 823 visits
- Lights on stairs 793 visits
- Like it was meant to be 732 visits
- Screen door 1601 visits
- Upper deck 773 visits
- Improved gate 1154 visits
- Skylights 781 visits
- Clean lines 1218 visits
- Ready to enjoy 1365 visits
- Clipped corner 727 visits
- Outswing french door 756 visits
- Fine jointery 1370 visits
- More jointery 1081 visits
- Wall looks good 716 visits
- Ties to roof 720 visits
- Screen frames 732 visits
- Nice fan 704 visits
- Grafted on 1344 visits
- Fits well 757 visits
- Nice structure 699 visits
- Straight down 714 visits
- The hood 680 visits
- Return pile 703 visits
- Seal of quality 761 visits
- Our work is done 690 visits
- Rails up 768 visits
- Upper lights mounted 737 visits
- Hide the wires 727 visits
- Cypress wall started 750 visits
- Almost done 771 visits
- Clipped corner 802 visits
- Cantilever 799 visits
- Inspector is here 737 visits
- Screens in 775 visits
- Roof sheeted 833 visits
- Basic structure 793 visits
- Door is in 781 visits
- Needs painter 783 visits
- Rafter up 814 visits
- Open roof 729 visits
- Driveway workshop 751 visits
- Siding cut out 733 visits
- J-Channel 666 visits
- Walls up 719 visits
- Just part of it 689 visits
- Before 745 visits
- Needs a door 710 visits
- Need a new gate 714 visits
- Big open deck 974 visits
- Before from above 741 visits
- The hood 1064 visits
- Driveway clean 690 visits
- Railing build 700 visits
- Last pieces 732 visits
- Complete 833 visits
- Nice fit 748 visits
- Belongs there 689 visits
- Ground cover 1187 visits
- Shadows 717 visits
- Cedar railing 1437 visits
- Decking with screws 685 visits
- From above 710 visits
- Straight down 735 visits
- Our work is done 912 visits
- Packed to leave 710 visits
- Seal of quality 714 visits
- Landin pad in 719 visits
- Rail post time 674 visits
- Stairs ready 1074 visits
- Driveway workshop 664 visits
- Decking 704 visits
- Stone is here 1132 visits
- The boardwalk 739 visits
- Beams up 654 visits
- Joist going in 680 visits