Home / 2008-Projects / Flynn Deck 18
The deck needed replaced and the screened porch needed a face-lift. After inspecting the screened porch we discovered that the beam structure used to hold it up was very inadequate. There was a single 6x6 used as a beam with 2 foot cantilevers on each e The deck needed replaced and the screened porch needed a face-lift. After inspecting the screened porch we discovered that the beam structure used to hold it up was very inadequate. There was a single 6x6 used as a beam with 2 foot cantilevers on each end. This is not strong enough to support the load and we were very surprised that it had not failed already. We built a temporary wall to hold up the screened porch and replaced the single 6x6 beam with a triple 2x12. We also added 2 additional footings only the load lines under the side walls to take some of the load off of the house and the beam. It is there to stay now. The deck was replaced with a composite deck and the screened porch was re-screened and trimmed out with white PVC trim. What a great new look, and it is now safe.
- 01 Before 788 visits
- 02 Before 796 visits
- 03 Before stairs 756 visits
- 04 Materials arrive 735 visits
- 05 WD is here 643 visits
- 06 Old deck gone 680 visits
- 07 Temp wall 698 visits
- 08 New footing 698 visits
- 09 New beam in 661 visits
- 10 New deck framed 661 visits
- 11 Temp wall gone 683 visits
- 12 Screened out 652 visits
- 13 Needs a new face 675 visits
- 14 Complete 640 visits
- 15 Nice finish 637 visits
- 16 Clean look 1043 visits
- 17 Seal of quality 641 visits
- 18 Nice stairs 721 visits