Home / 2008-Projects 118
Creation date / 2008 / April
- 05 Lumber pile almost gone 861 visits
- 06 Need to clean up 872 visits
- 07 Getting close 789 visits
- 01 Before 818 visits
- 13 Our work is done here 846 visits
- 07 Nice Finish 885 visits
- 08 All done 826 visits
- 09 Just need landscaping 879 visits
- 09 The roses will climb here 894 visits
- 10 Nice bench 882 visits
- 11 Nice view 912 visits
- 12 To be filled with flowers 849 visits
- 02 WD has arrived 758 visits
- 03 Ready to work 769 visits
- 04 Lumberyard 818 visits
- 05 Tearing down 798 visits
- 06 Almost down 710 visits
- 07 Digging 745 visits
- 08 Old deck gone 792 visits
- 09 Old deck to dump 714 visits
- 17 Our work is done here 820 visits
- 10 Framing done 675 visits
- 11 Pieces parts 808 visits
- 12 We will clean 736 visits
- 16 Seal of quality 750 visits
- 15 Other side 817 visits
- 14 Nice view 785 visits
- 13 Complete 778 visits
- 04 Need to rebuild the rim board 836 visits
- 05 Not much was holding the deck 753 visits
- 06 Added insulation 752 visits
- 07 The lumberyard 753 visits
- 08 New rim board is in 814 visits
- 09 Sheeting over rim 810 visits
- 10 Make it dry 722 visits
- 11 Framing 796 visits
- 03 WD has arrived 783 visits
- 12 Making parts 710 visits
- 13 Decking going on 718 visits
- 14 Return pile 856 visits
- 18 Nice privacy wall 827 visits
- 15 Complete 845 visits
- 16 Complete 742 visits
- 17 Complete 809 visits
- 19 Under finished 859 visits
- 02 WD arrives 792 visits
- 03 Material 800 visits
- 04 Footings marked 788 visits
- 05 Footings dug 784 visits
- 06 Siding removed 707 visits
- 07 Framing 790 visits
- 01 Before 786 visits
- 02 Everything through gate 682 visits
- 08 Rail going up 767 visits
- 09 Pad in 760 visits
- 10 Ready for privacy wall 979 visits
- 11 Complete 897 visits
- 12 From stair side 728 visits
- 13 Nice rail 716 visits
- 14 Good landing 712 visits
- 15 Privacy wall done 1972 visits
- 16 The way out 720 visits
- 16 Decking seam 867 visits
- 17 Privacy from outside 1387 visits
- 02 WD has arrived 703 visits
- 03 Material 824 visits
- 04 More material 790 visits
- 05 We need to make the house stronger 622 visits
- 06 Blockin in and ledger up 724 visits
- 07 Additional rim and ledger installed 609 visits
- 08 Footings are dug 665 visits
- 09 Framing complete 773 visits
- 10 Happy Tenant 711 visits
- 11 Holes 741 visits
- 01 Before 877 visits
- 02 Before 808 visits
- 12 Almost done 710 visits
- 13 Looking good 632 visits
- 14 Nice finish 685 visits
- 15 Great view 704 visits
- 16 Seal of quality 594 visits
- 17 Time to move trailers 637 visits
- 18 The real inspector 657 visits
- 19 Thats a wrap 662 visits
- 03 Old deck to the dump 861 visits
- 02 Wd has arrived 835 visits
- 04 The lumberyard 837 visits
- 05 Holes dug 803 visits
- 06 Framing starts 875 visits
- 07 Decking on 890 visits
- 08 Pad poured 867 visits
- 11 Return pile 763 visits
- 09 Almost done 859 visits
- 02 Material 729 visits
- 10 Lights wired 870 visits
- 12 Nice landing 874 visits
- 13 Complete 890 visits
- 14 Complete 720 visits
- 15 Complete 794 visits
- 24 Our work is done here 836 visits