Home / 2008-Projects 707
Creation date / 2008
- 10 Make it dry 722 visits
- 11 Framing 796 visits
- 03 WD has arrived 783 visits
- 12 Making parts 710 visits
- 13 Decking going on 718 visits
- 14 Return pile 856 visits
- 18 Nice privacy wall 827 visits
- 15 Complete 845 visits
- 16 Complete 742 visits
- 17 Complete 809 visits
- 19 Under finished 859 visits
- 02 WD arrives 792 visits
- 03 Material 800 visits
- 04 Footings marked 788 visits
- 05 Footings dug 784 visits
- 06 Siding removed 707 visits
- 07 Framing 790 visits
- 01 Before 787 visits
- 02 Everything through gate 682 visits
- 08 Rail going up 767 visits
- 09 Pad in 760 visits
- 10 Ready for privacy wall 979 visits
- 11 Complete 897 visits
- 12 From stair side 728 visits
- 13 Nice rail 716 visits
- 14 Good landing 712 visits
- 15 Privacy wall done 1972 visits
- 16 The way out 720 visits
- 16 Decking seam 867 visits
- 17 Privacy from outside 1387 visits
- 02 WD has arrived 703 visits
- 03 Material 824 visits
- 04 More material 790 visits
- 05 We need to make the house stronger 622 visits
- 06 Blockin in and ledger up 724 visits
- 07 Additional rim and ledger installed 609 visits
- 08 Footings are dug 665 visits
- 09 Framing complete 773 visits
- 10 Happy Tenant 711 visits
- 11 Holes 741 visits
- 01 Before 879 visits
- 02 Before 808 visits
- 12 Almost done 710 visits
- 13 Looking good 632 visits
- 14 Nice finish 686 visits
- 15 Great view 704 visits
- 16 Seal of quality 595 visits
- 17 Time to move trailers 637 visits
- 18 The real inspector 657 visits
- 19 Thats a wrap 662 visits
- 03 Old deck to the dump 861 visits
- 02 Wd has arrived 835 visits
- 04 The lumberyard 838 visits
- 05 Holes dug 803 visits
- 06 Framing starts 875 visits
- 07 Decking on 890 visits
- 08 Pad poured 867 visits
- 11 Return pile 763 visits
- 09 Almost done 859 visits
- 02 Material 729 visits
- 10 Lights wired 870 visits
- 12 Nice landing 874 visits
- 13 Complete 890 visits
- 14 Complete 720 visits
- 15 Complete 794 visits
- 24 Our work is done here 836 visits
- 16 One heavy grill 754 visits
- 17 Divider 978 visits
- 18 Nice view 830 visits
- 19 Gate open 820 visits
- 20 Stairs down 904 visits
- 21 Gate closed 813 visits
- 22 Open spaces 799 visits
- 23 Seal of quality 917 visits
- 01 Before 807 visits
- 02 Before 836 visits
- 03 WD Arrives 676 visits
- 04 Lumberyard 710 visits
- 05 Holes 672 visits
- 06 Ledgers 707 visits
- 07 Framing done 711 visits
- 08 Landing up 642 visits
- 09 Pad poured 596 visits
- 10 Posts cut 653 visits
- 11 Railing going up 738 visits
- 12 Rail pickets 711 visits
- 13 Platform steps 666 visits
- 14 Return pile 683 visits
- 15 IMG 2511 678 visits
- 16 Complete 716 visits
- 17 Stairs done 776 visits
- 18 Nice pad 771 visits
- 19 Nice view 695 visits
- 20 Railing detail 738 visits
- 22 Seal of quality 715 visits
- 21 Platform steps done 785 visits
- 03 WD on the job 718 visits
- 04 Pad needs to go 715 visits
- 05 Insert patio here 709 visits
- 06 Patio gone 766 visits